Renovation Wrap Up #3

Construction has resumed out back. In order to make the slab as sturdy as possible, the construction crew has to get rid of the organic material where the slab will be poured. We look forward to seeing more results in the weeks that follow!


Important Notes

  • Take quick showers - showers may be cold
    • due to construction, we no longer have our propane back up to our solar shower water heater
  • To enter the building from the pool, please use the side or front doors
    • Black mats have been duct taped to the perimeter of the gym
      • When exiting the pool, please stay on the black mats to avoid wet floors
  • The Island Rec Center building is scheduled to close March 17th. The pool will remain open. Portable restrooms will be available. 